Project
US 421
 |
Client
Indiana Department of Transporation (INDOT)
Location
Indianapolis, Indiana
Description
Need for the improvement is based on the facility’s lack of traffic
capacity along corridor, substandard geometrics with respect to
Vertical alignment and roadway and roadside cross-section
elements, and crash history. Existing levels of service (LOS) have
fallen to substandard levels, particularly along the south half of
the corridor.
The purpose of this project is to improve the traffic flow/mobility
And safety of US 421 by adding capacity and improving
geometrics along the corridor.
Level 5 re-scoped the work to fit within INDOT’s budget and reduced
the scope to include only the work between the south end (near SR
334) and 146th Street (CR 300S).
Construction Cost
$25,000,000 |
 |
|
|